a) Check for conductivity between terminals 1 and 2.
b) Check for conductivity between terminals 3 and 4.
c) Check for continuity between terminals 1 and 4.
![]() | ![]() |
If the test results are negative, replace the relay.
2. Checking the operation of the relay.
a) Connect the battery to terminals 1 and 2 of the relay.
b) Check for conductivity between terminals 3 and 4.
c) Check for continuity between terminals 1 and 4.
If the test results are negative, replace the relay.

[View the original source on the website: ToyotaMAN.ru]


