- A) Disconnect hoses #0, #2 and #3 from solenoid valves.
- b) Insert plug into hose #3.
- V) Create a vacuum of 500 mmHg. Art. in the NsO hose and check that the vacuum is reduced by no more than 45 mmHg. Art. within 15 seconds.
2. Check up a diaphragm of inclusion of blocking of interaxal differential.
- A) Disconnect hoses #1 and #2 from solenoid valves.
- b) Create a vacuum of 500 mmHg. Art. in hose #1 and make sure the vacuum is reduced by no more than 45 mmHg. Art. within 15 seconds.
3. Check up a diaphragm of switching off of blocking of interaxal differential.
- A) Disconnect hoses #0, #1, #2 and #3 from solenoid valves.
- b) Insert plug into hose #3.
- V) Create a vacuum of 500 mmHg. Art. in #0 and #2 hoses and make sure the vacuum is reduced by no more than 45 mmHg. Art. within 15 seconds.
Attention: simultaneously create a vacuum in hoses No. 0 and No. 2.
- G) Install the hoses to the solenoid valves.
Caution: Make sure all hoses are properly installed and securely attached to the solenoid valves.