1, Install a new gasket, turbocharger bearing holder cover and tighten the two bolts. Tightening torque: 8 Nm.
2. Install a new gasket and coolant pipes by tightening the two nuts. Tightening torque 13 Nm.
3. Install oil pipes.
- A) Install a new gasket and secure the oil pipes with two nuts. Tightening torque: 18 Nm.
Note: Align the oil hole on the gasket with the oil port hole in the turbocharger.
4. Install the turbocharger assembly.
- A) Install new gasket and turbocharger assembly, tighten 4 nuts. Tightening torque: 53 Nm.
- b) Install the oil pipe bracket to the cylinder block. Tightening torque: 8 Nm.
- V) Install the two gaskets and connect the oil pipes to the oil filter bracket. Tightening torque: 25 Nm.
- G) Connect the following hoses:
- (1) - two coolant supply hoses;
- (2) - oil drain hose.
5. Install new gasket, outlet fitting and tighten 4 nuts.
6. Install the exhaust manifold bracket. Tightening torque 61 Nm.
7. Install the turbocharger bracket.
Torque:
- to the cylinder head - 30 Nm
- to catalytic converter (outlet) - 54 Nm
8. Install thermal insulators.
(Modifications)
- A) Install heat shield #2 and tighten the two bolts.
- b) Install heat shield #1 and tighten 4 bolts and nut.
(serial version)
- A) Install the N®2 exhaust manifold heat shield and tighten the two bolts.
- b) Install the heat shield Ns1 and tighten the bolt, nut.
- V) Install Heat Shield #1 and Tighten the two bolts.