- Bolt M12 64 Nm
- Bolt M10 46 Nm
2. Install the rear engine mount bracket and secure it with three bolts. Tightening torque 77 Nm.
3. Connect the left engine mount.
- A) Align the gearbox/diff assembly and engine.
- b) Install and tighten the two bolts and nuts.
- Torque:
- Bolt 64 Nm
- Nut 72 Nm
- V) Install the left engine mount bracket.
4. Connect the rear engine mount.
- A) Install and tighten the rear support bolt. Tightening torque 87 Nm.
- b) Install and tighten the two nuts and bolt. Tightening torque 72 Nm.
- V) Install two plugs.
5. (For S series engines) Install the bracket.
- A) Install the bracket.
- b) Tighten the bolts in alphabetical order.
- Torque:
- Bolt M8 21 Nm
- Bolt M10 44 Nm
- V) (For 3S-GE engine) Tighten the nut. Tightening torque 44 Nm.
- (For 3S-FE engine) Install the manifold stand and tighten the bolt and nut.
6. Install the center beam of the engine mount
- A) Install the beam and tighten the four bolts. Tightening torque 35 Nm.
- b) Connect the front engine mount and tighten the three bolts. Tightening torque 72 Nm.
- V) Install two plugs.
- G) Install the beam guard and tighten the two bolts.
- d) Install and tighten the bolt. Tightening torque 72 Nm.
- e) Install the plug.
- and) Connect the air conditioner pipe clamp.
7. Install drive shafts.
8. (For engine 2C) Install a new gasket and connect the muffler downpipe. Tightening torque 43 Nm.
9. (For S series engines) Install the muffler downpipe.
- A) Install new gaskets.
- b) Install the downpipe.
- V) Install and tighten four bolts and nuts. Tightening torque 43 Nm.
- G) Attach the downpipe support with two bolts.
- d) Connect the oxygen sensor connector.
10. Fill transmission oil into the gearbox. Transmission oil:
- API Oil Grade: GL-3, 4 or DEXRON II
- Recommended viscosity: SAE75W-90
- Filling capacity 2.6 l
11. Install the motor guard.
12. Install the front wheels and lower the vehicle. Tightening torque 103 Nm.
13. Install and tighten the two upper gearbox mounting bolts. Tightening torque 64 Nm.
14. Connect the speed sensor connector.
15. Connect the transmission control cables.
- A) Install cable holders
- b) Connect the cables with washers and cotter pins.
16. Install the ground wire.
17. Connect a socket of the gauge of inclusion of lanterns of a backing.
18. Install the tube clamp and clutch slave cylinder. Tightening torque 12 Nm.
19. Install the starter.
- A) Install starter.
- b) Install and tighten the two bolts. Tightening torque 39 Nm.
- V) Connect the connector and wire to the starter.
20. Install the air filter.
21. Install fuse block N82, battery and connect positive terminal.
22. Connect the negative battery terminal.
23. Check up corners of installation of forward wheels.
24. Do a road test.