- Tightening torque - 23 Nm
2. Installation on the engine.
A) Align the mark on the pump flange and the timing belt cover.
b) Tighten the flange nuts.
- Tightening torque - 21 Nm
V) Install the rear pump support. Tighten the mounting bolts.
- Tightening torque - 18 Nm
3. Check the injection advance setting angle.
4. Install the high pressure pipes. Tighten the tube nuts.
- Tightening torque - 25 Nm
Note: On a pre-injection engine, do not damage the injection assembly on the pump head.
5. Connect fuel hoses.
6. Connect the wiring connectors.
7. Connect water hoses to heat control thermostat.
8. Connect a vacuum hose of management TNVD at inclusion of the conditioner.
9. Connect the accelerator cable.
10. Install the injection pump drive pulley.
11. Install the timing belt.
12. Fill the cooling system.
13. Start the engine and check for fuel leaks.
14. Check up turns of the minimum and maximum idling.