1. Check the tightness of the system.
A) Open the high pressure valve on the gauge block and charge the system with refrigerant.
b) When the pressure on the low pressure side reaches 98 kPa, close the high pressure valve.
V) Check the system for leaks with a leak detector.
G) If leaks are found, repeat the evacuation procedure after repair.