Note:
- Thoroughly clean all parts to be installed.
- Before mounting rotating and/or sliding parts, lubricate their working surfaces with fresh engine oil.
- Replace all gaskets, seals and valve stem seals with new ones.
1. (ZS-T) Install combustion chambers. Overhang 0.03 - "+" 0.02mm
2. Install valves.
A) Using a suitable tool, install new valve stem seals.
Note: Inlet valve stem seals are painted gray or brown, and exhaust valve stem seals are painted black.
b) Install the following parts:
- (1) valve;
- (2) spring seat;
- (3) valve spring;
- (4) spring plate.
V) Using a suitable tool, compress the valve spring and install two cotters around the valve stem.
G) With a plastic-headed hammer, lightly tap the end of the valve stem to ensure that the valve is securely fixed with crackers.
3. Install the valve lifters and shims; make sure the pushers turn freely by hand.